Question: Is a foundation a mandatory requirement? Answer: Not for temporary setups, but for permanent use concrete is recommended.
Question: How many guy wires are typically used? Answer: Usually three to four per level.
Question: Can it be installed without guy wires? Answer: Only if the mast is no higher than 4–5 meters and the load is light.
|